Skip to content Skip to footer

Prime Minister Electric Bike Scheme | Subsidy & Apply Online

Pakistan’s venture into sustainable and affordable mobility has taken an important step with the establishment of the Prime Minister’s Electric Bike Scheme. The scheme is a response to the rising price of fuels, is a solution to various environmental issues, and is a good source of transport for daily mobility with sustainable means in the form of an e-bike, as a good option. Through a generous subsidy with interest-free loans, the program aims to provide these environmentally sustainable, operator-oriented commuting solutions to students, women, and the working class. 

The scheme was officially launched on 1st September 2025. In an effort to reduce reliance on fuel, take a step towards green transportation, and, perhaps most importantly, ease the financial burden placed on students and the working-class population who commute daily. Startlingly, the e-bike subsidies are to be given to qualifying citizens through loans and interest-free installment plans.

What is the Prime Minister’s E-Bike Scheme 2025?

This scheme is about more than transportation: it represents broader social, economic, and environmental reform. The PM’s scheme represented an effort at the national level to alleviate rising fuel costs, promote cleaner energy use, and offer empowerment to socially marginalized groups, specifically low-income individuals, students, and women. 

The plan aimed to promote social equity and lessen carbon emissions across Pakistan by aiming to accelerate the transition to more electric vehicles on local streets and roads in Pakistan. The scheme aims to place two million e-bikes on the road by 2030.

Several issues compelled the government to implement this scheme: the ongoing rise in petrol prices; the effects of traditional fuel-based commuting on air quality; the lack of mobility among students; and, most importantly, the lack of mobility and dependence on traditional fuel modes of transport for women and overall access to transportation. 

Additionally, this emerging program aligns with the Government of Pakistan’s efforts to promote greener transitions, to discourage dependence on imported fuels, and, more generally, to grow the local EV sector and market. This subsidy scheme will align with the government’s stated long-term plan, aligned with the national New.

What Does the Federal Government E-Bike Scheme Offer?

The goal of the Pakistan E-Bike Scheme 2025 is clear: to provide students with an affordable and environmentally friendly mode of transportation. Introduced in the Pakistan Budget 2025-26, the scheme offers 27,000 bikes, specifically for students from all districts of the province. Here’s a breakdown of the Pakistan bike scheme:

Registration ModeOnline
Launch Date1st September 2025
Last Day of Registration30th September 2025
EligibilityOpen to all Pakistani citizens
Age Limit18 to 65
Number of Electric Bikes116,000 (in phase 1)

Financial Structure

To make e-bikes affordable, the government is providing a subsidy of up to Rs 50,000 and interest-free loans of up to Rs 200,000, repayable over two years. Monthly installments will range from Rs 6,250 to Rs 8,333, depending on the e-bike model and bank terms. The interest will be paid by the government, making the scheme accessible for individuals who cannot afford to pay up front.

This means buyers will only pay an easy monthly payment between Rs 6,250 to Rs 8,333, depending on the bike, bank, and terms. Also, the government will pay for all of the interest costs, so the applicants will only pay the principal amount. This structure is supposed to help alleviate financial worries and promote wider access to clean and efficient transportation.

Who is Eligible for the Scheme?  

The Pakistan E-Bike Scheme operates under strict eligibility criteria, and not all students will meet these requirements. 

  • Age: Applicants have to be aged 18 – 65.
  • Area of Residence: Applicants have to be residents of Pakistan.
  • Valid License: The applicant must hold a valid learner’s permit or driver’s license.
  • Not already a beneficiary of a similar government scheme.

One of the most encouraging aspects of the Federal Government Electric Bike Scheme 2025, in addition to its huge scope, is the number of people it is targeting: 

Young Professionals and Entrepreneurs

The scheme also targets young professionals and entrepreneurs as an eco-friendly way of commuting to work. The government also aims to maximize the number of green workers through an accessible electric bike scheme.

Students

As part of Pakistan’s federal electric bike scheme, eligible students will get a free electric bike. This program aims to encourage young people to transition from motorcycles to eco-friendly electric bikes, providing a sustainable, cost-effective way to commute. Primarily, the program is suited to urban students, who require easy, affordable travel options.

Females

A key feature of the program is the female quota, which guarantees each female student or working professional one electric bike. The goal is to empower women with accessible and affordable transportation options for commuting purposes.

Special Quotas and Inclusivity

The program has a 25% female quota, a significant number of bikes assigned for students, and 10% of bikes for applicants from Balochistan. The scheme is also targeted at lower-income earners, daily wage earners, and delivery riders, so it is made available for those who need it the most.

Step-by-Step Guide to Prime Minister’s E-Bike Scheme Registration Online

Ready to apply? Here’s how you can complete your Pakistan bike scheme registration online in just a few steps:

  1. Visit the Official Portal

Go to the official pave.gov.pk website.

  1. Create an Account
  • Click on “Register.”
  • Enter your CNIC, email, and phone number
  • Make a strong password 
  1. Fill Out the Application Form
  • Name 
  • Address
  • CNIC number 
  • Academic or employment institution details 
  • Contact number 
  • Select your preferred bike type
  1. Submit Required Documents
  • Recent passport-size photograph
  • Proof of employment or education
  • Driver’s License or learner’s permit 
  • Bank account details for installment payments
  1. Review and Submit
  • Double-check all information
  • Submit your application
  1. Document Verification

The relevant bank will check your documents and process the applications, which could take up to 10 days.
If selected, you’ll receive a confirmation email/SMS.

  1. Pay Down Payment
  • Visit the designated bank branch
  • Pay the down payment 
  • Submit the payment slip online
  1. Collect Your Bike

The delivery will be processed through the OEM (vehicle manufacturer). The final delivery location will be verified on the portal with your chosen bank.

Partner Banks for the Prime Minister’s Electric Bike Scheme 2025

To ensure seamless financing and accessibility all over Pakistan, the government has developed a network of public and private sector banks for the purpose of implementing the Prime Minister’s Electric Bike Scheme 2025. The banks will process requests for interest-free loans, install payments, and disburse subsidies. The full list of partner banks is as follows:

  1. National Bank of Pakistan (NBP)
  2. Bank of Punjab (BOP)
  3. Sindh Bank
  4. Bank of Khyber (BOK)
  5. First Women Bank Limited
  6. Zarai Taraqiati Bank Limited (ZTBL)
  7. Allied Bank Limited (ABL)
  8. Askari Bank Limited
  9. Bank Alfalah Limited
  10. Bank Al-Habib Limited (BAHL)
  11. Habib Bank Limited (HBL)
  12. Habib Metropolitan Bank
  13. JS Bank Limited
  14. MCB Bank Limited (MCB)
  15. Soneri Bank Limited
  16. Standard Chartered Bank (Pakistan)
  17. United Bank Limited (UBL)
  18. Meezan Bank Limited
  19. Bank Islami Pakistan Limited
  20. Dubai Islamic Bank Pakistan
  21. Al Baraka Bank (Pakistan) Limited
  22. Faysal Bank Limited

If you don’t have an existing account with one of the partner banks listed under the Prime Minister’s Electric Bike Scheme 2025, you can simply create a new account with one of them to submit your application. These banks are authorized to process applications, give loans, and process payments on behalf of the scheme. After your documents are submitted, the final decision for approval or rejection of your application is with the bank based on their eligibility checks and internal verification. For that reason, applicants should make sure their data is all correct and complete as possible to avoid any delays or rejections.

Will there be any processing charges?

There will:

  • No loan processing fees
  • No charges for early loan settlement

However, you will have to pay:

  • Bank documentation charges
  • First-year insurance premium

The Role of Okla in the Electric Bike Scheme

OKLA is assisting the government of Pakistan in providing electric bikes to the people as part of its contribution to green transport. To do this, OKLA is leveraging its existing infrastructure to help facilitate the application and registration procedures of the Federal Government Electric Bike Scheme 2025 for the e-bike applicants throughout Pakistan. 

OKLA’s participation ensures that the electric bikes they deliver will feature the best specs and be as high-performing and reliable as fuel bikes. The following are the OKLA (RAVI AUTO SUNDER (PVT) LTD)

Bikes available on the federal government e-bike website are:

MODEL: OKT

Model Specifications 
Battery TypeLithium Iron
Voltage72V
Capacity30AH
Power2160 Wh
Max Speed50 km/hr
Battery Charging3.5-4 hours
Max. Range with Charge60 km/charge
Motor typeBrushless DC
Rated Power1000 W
IP-RatingIP67
Battery Warranty3 years or 40,000 km
Vehicle Warranty2 years or 40,000 km
Official Price248,500

MODEL: OMIGO

Model Specifications 
Battery TypeLithium Iron
Voltage72V
Capacity30AH
Power2160 Wh
Max Speed50 km/hr
Battery Charging3.5–4 hours
Max. Range with Charge60 km/charge
Motor TypeBrushless DC
Rated Power1000 W
IP-RatingIP67
Battery Warranty3 years or 40,000 km
Vehicle Warranty2 years or 40,000 km
Official PricePKR 249,900


All OKLA Omigo electric bikes made available through this program are backed by a legally registered, recognised company. This provides assurance on authenticity, quality assurance, and after-sales support, and the applicants who select OKLA as their e-bike brand can easily confirm that they have made an authentic and dependable purchase under this government-backed initiative.

Conclusion

The Federal Government Electric Bike Scheme 2025 is a giant leap forward in growing a sustainable Pakistan. This initiative provides a significant commitment to a progressive and inclusive Pakistan.

The E-Bike Scheme is an initiative of the government of Pakistan in pursuit of sustainable mobility in the country. Within the budget of Rs 9 billion for the first phase, the government will be distributing 116,000 e-bikes and developing infrastructure such as EV charging stations, mostly focused on specific cities, with Islamabad being the primary. 

The scheme also benefits the country’s commitments toward climate goals as well as provides an opportunity for future economic upliftment, especially in hard-to-reach regions of the country, such as Balochistan.

As they work towards implementing the NEV Policy 2025-30, the nation is well-positioned to make serious strides towards a reduction in its carbon footprint and build out a sustainable transportation ecosystem. So don’t forget to apply for your electric bike today to help Pakistan move one step closer to its greener, cleaner future!

Frequently Asked Questions (FAQs)

What is the Shahbaz Sharif Electric Bike Scheme 2025?

It is a government effort to provide affordable, greener electric bikes through subsidizing and interest-free payments to students, women, and low-income citizens.

Who can apply for the scheme?

Any Pakistani citizen who is between the ages of 18-65 years, holding a valid CNIC and has a motorcycle driving license or learner’s driving license is eligible to apply for this scheme. The scheme is for students, women, low-income individuals, delivery riders, and residents of Balochistan.

How can I apply for OKLA’s bikes?

OKLA is officially registered under RAVIAUTO SUNDER (PVT) LTD, which means that all OKLA electric bikes made available through this program are backed by a legally registered, recognized company. 

Can I apply for more than one vehicle?

No. Individual applicants can apply for only one vehicle. However, fleet operators may apply for multiple rickshaws/loaders, as per limits set by the Steering Committee.

How do I track my progress/application and delivery?

You can track the progress of your application and the status of your delivery through the official online portal for the program.

How will I know when my application is approved?

When your application is approved by the bank and your e-bike is allocated, you will receive a notification via the online portal, SMS or email.

Can I cancel or withdraw my application after submission?

At present, there is no official withdrawal policy. Cancellations will be at the discretion of the individual partner bank with applicable terms and conditions.

Can I select the brand or model of an electric bike?

Yes, applicants may select from a list of pre-approved e-bikes (linked as a downloadable PDF document).

Does the financing plan require a guarantor?

Yes, and this is especially the case for students. The guarantor is usually a parent, guardian, or close relative.

Can female students apply?

Yes, the scheme encourages female students to apply, while 25% of the e-bike quota is set aside for women, whom we encourage to apply for safer and more independent travel.

Are there other bikes besides Federal electric bikes in the scheme?

No, the scheme is only available for electric bikes to support eco-friendliness and fuel-free travel.

What is the process to apply for the scheme? 

Applications must be submitted through an official online application at the following link:

https://pave.gov.pk 

When will the bikes be delivered? 

Bikes will be delivered from authorized distribution centres upon successful selection and payment plan acceptance. The delivery dates may vary by area.

What if I have already applied to another electric vehicle scheme in any province?

You can still apply! However, you may not be eligible for dual benefits. The final decision will be made by the Steering Committee.

Can I choose a model priced higher than Rs. 250,000?

Yes, you can select a model priced above PKR 250,000. However, in such cases, the user must pay the difference (above Rs. 250,000) up front. For example, if the model is priced at PKR 300,000, the user must pay the additional PKR 50,000 upfront over and above the initial/down payment to the bank once their application is approved.

×